FOLLOW US >>
The installation of wind-energy farms has grown dramatically the past five years and so has the equipment to install these lines.
The McLaughlin M-4500 series are cable of producing tunnels 4.5 inches in diameter using the dry compaction or slurry boring method of drilling.
FOLLOW US >>