Icon Tunnel and Shoring Systems

Pro-Tec Equipment

Pro-Tec Equipment introduces its line of lightweight Pipeline High Clearance Arches. Designed with pipeline crews in mind, these arches, when paired with eight-feet tall aluminum or eight-feet tall lightweight three-inch steel trench walls, provide 72-inches of vertical pipe clearance, while still allowing crews to use smaller sized machines. 800.292.1225, pro-tecequipment.com

Efficiency Production

ICON Equipment offers aluminum trench boxes in 2-sided, 3-sided and 4-sided configurations.

ICON offers lightweight aluminum hydraulic shoring as one of the safest, most versatile means and methods of shoring even the most difficult excavation.

Auger boring equipment from The Robbins Company, McLaughlin Group, ICON Tunnel Systems, American Augers, Akkerman, Bor-It Mfg. and Barbco.

The Robbins Company

Trench shoring equipment from ICON Equipment, Pro-Tec Equipment, Efficiency Production, American Shoring and GME.

ICON’s slide rail shoring systems are made of high-yield, Grade 50 steel and are comprised of lineal panels, rails or posts and bracing. This allows contractors to install three or four sided pits and two sided trenches in a variety of excavations and soil conditions. Contractors can choose slide rails in single-, double- or triple-rail designs with either Roller Rail Frames [struts] or Fixed-Position Braces.

Auger boring equipment from McLaughlin Group, American Augers, ICON Tunnel Systems/Bohrtec, Akkerman, Bor-It Mfg., The Robbins Company and Barbco.

Syndicate content