Keeping The Sewer Running In Saskatoon

By Jeff Griffin, Senior Editor | January 2013, Vol. 68, No. 1

After completion of the CIPP rehabilitation, the bypass plug was pulled after 26 days of continuous operation and flow restored to the 84-inch line.

“Despite all the challenges, the teamwork among the city, Insituform and Sunbelt resulted in the successfully executed construction and operation of one of the largest sewer bypasses in Western Canada,” Gould concluded.

FOR MORE INFO:

Sunbelt Rentals, (800) 667-9328, www.sunbeltrentals.com
Insituform, (800) 234-2992, www.insituform.com
Hamm Construction Ltd., (306) 931-6626, www.hammconstruction.ca

Buyer's Guide