Latest Articles

More than 300 concrete pipe professionals from across North America will gather in Orlando next month for the 2015 ACPA Pipe School, an annual industry highlight featuring world-class training, education and networking.

The board of directors of McKim & Creed Inc., a 350-person engineering, planning and geomatics firm with offices throughout the South, announced that John T. Lucey, Jr., PE, has been named the company’s next president and chief executive officer.

Channeline has been involved in the provision of specialist GRP structural lining elements for over three decades, during which time we have accumulated an unrivalled degree of experience relative to the rehabilitation of both circular and non-circular large diameter buried pipeline structures worldwide.

The Texas Water Development Board (TWDB) approved by resolution financial assistance in the amount of $4,996,250, consisting of a $1,820,000 loan and $3,176,250 in loan forgiveness from the Clean Water State Revolving Fund, to the Angelina & Neches River Authority (Angelina County).

ACS Underground Solutions, a privately owned consulting company in Georgetown, CT., has provided utility locating, leak detection and sewer inspection services to utility and construction companies, engineering firms, municipalities and academic institutions for more than 20 years.

AV-550 Soil Strengthener is designed to permeate and stabilize various types of soil.

On Jan. 9, the Nebraska Supreme Court reversed a lower court’s 2012 ruling that deemed a law granting Gov. Dave Heineman’s authority to approve the Keystone XL pipeline in violation of the Nebraska constitution.

New Mexico changed its Pipeline Safety Excavation Damage Prevention Regulations on Dec. 30, 2014.

In some ways, UGI Utilities is fortunate to be so far ahead of the game when it comes to infrastructure replacement.

Amid falling oil prices and a failure to secure enough commitment from shippers, Enterprise Products Partners LP has decided not to move forward with a proposed pipeline for its 1,200-mile pipeline crude pipeline from the Bakken shale formation of North Dakota to Cushing, OK. The proposed pipeline would have fed into the Seaway Pipeline system and have an initial capacity of 340,000 barrels per day of crude with an option to expand it to more than 700,000 barrels per day.

BJM pump

BJM pump
BJM Pump

The J-Series electric submersible pumps offer top performance and high quality for a very modest investment. The pumps are designed for long life and trouble free performance. The J-Series electric submersible pumps offer top performance and high quality for a very modest investment.