Latest Articles

Are you missing out on ICUEE this year? Going, but not sure how to cram everything into your schedule? Watch this space.

Underground Construction is bringing you the highlights of the underground experience at ICUEE as we blog from the show. We'll have product sneak previews, quotes from the movers and shakers, the lowdown on what will move the underground industry next year and much more from the Demo Expo.

According to FERC, the Kinder Morgan’s Rockies Express Pipeline is the largest currently under construction. Members of the Commission have unofficially dubbed it “The King of Pipelines.”

When it comes to associations, bigger isn't necessarily better – small local and regional organizations can be very effective in serving their members, especially for those serving specialized, niche markets.

Q-TEK Saddle Fusion Machines eliminate the need for shims, spacers, chains and complicated head changes.

The BS-4 Butt Fusion Machine is capable of butt fusing ½- to 4-inch IPS pipe and fittings.

Most major American cities today face multiple challenges to provide basic water and sanitary services.

For a stronger, more reliable leak-proof seal, Friatec has engineered a smarter than traditional fusion system.

Chemical grouting is a joint sealing and stabilization process used to stop ground water flow through soils surrounding structurally sound sewer pipes or structures.

The compact B280 Butt Fusion System features a four-clamp system that is designed to fuse PE and HDPE pipe from 1 ¼ to 6 inches in diameter.

Brent Lane and his business partner, Steve Parker, have witnessed the ups and downs of the horizontal directional drilling business.