Mega-Size Sewer Lift Station Construction Requires Unique Shoring System

January 2010 Vol. 65 No. 1
Weihe and ESI were able to come up with a modified ClearSpan slide rail system with the addition of sheeting on the deep end.

FOR MORE INFO:
Weihe Construction: (317) 776-2966, http://weiheconstruction.com
Efficiency Productions, Inc., (800) 552-8800, www.epi-shields.com
Excavation Safety International, (317) 841-0185, www.excavationsafetyint.com

Buyer's Guide