Pipe jacking equipment

Europe, like the United States, is struggling to upgrade its infrastructure. In Poland, for example, over 1,000 wastewater treatment plants need to be constructed or upgraded in order to meet European standards which take effect in 2015. Warsaw, the capital and largest city in Poland, has many planned upgrades, including a recent two-year-long project which will provide added capacity and decrease overflows.

Compiled by Traci Read, Senior Editor

The 2009 Pipe Selection Guide is now available for download!

When Neal Jinkerson and Nick Walters began working for the pipeline construction division of Henkels & McCoy Inc. many years ago, there was a distinct time frame for what constituted the construction season.

Jeff Griffin, Senior Editor

Vermeer is introducing a new laser-guided, grade-control pipe installation system that the company says has several design features not available on other on grade equipment currently available in North America.

The Guided Boring method installs small diameter pipes with grade and alignment precision.

The new GradeLight 2700 introduced by AGL is the shortest pipe laser available. Its 10.5 inch length makes it ideal for fitting tight inverts and small pipe jacking pits.

Jeff Griffin, Senior Editor

Vermeer is introducing a new laser-guided, grade-control pipe installation system that the company says has several design features not available on other on grade equipment currently available in North America.

Syndicate content