Rehabilitation

Vac-Con Inc. has partnered with Cues Camera to upgrade its Inspector Cam secondary product line. Vac-Con has been working with product engineers with Cues Camera since August of 2011.

New Castle County, DE, has awarded RJN Group Inc. two collection system project extensions within the White Clay Creek Sewer Basin.

The newest Version 6.4.5 of PipeLogix’s suite of pipe survey software tools features the redesign of the Recording and Playback forms in the DVS module. This change enables the user to take a picture during a survey and add it with one click during live recording and from playback of videos.

Rehabilitation specialist Janssen Umwelttechnik is offering a new injection process for no-dig rehabilitation of faulty joints in sewer lines from 8 to 24 inches. It is especially suited for sewer lines, where the lateral connections are still completely intact.

Inliner Technologies is expanding its presence in Canada through an agreement with Ontario-based Clean Water Works to use the Inliner method of cured-in-place pipe to renew deteriorating municipal and industrial wastewater piping infrastructure.

The National Association of Sewer Service Companies (NASSCO) has released the “Introduction to Sewer Cleaning with Jetting Equipment” video to further their mission to set industry standards for the assessment and rehabilitation of underground pipelines, while assuring the continued acceptance and growth of trenchless technologies.

The National Association of Sewer Service Companies (NASSCO) has extended the deadline for Pipeline Assessment Certification Program (PACP) recertification from Feb. 29 to Aug. 31, 2012.

Repairing broken polyvinylchloride (PVC) conduit is no longer an arduous and time-consuming task with the new Carlon PVC Conduit Repair System from Thomas & Betts. The exclusive, patent-protected design allows contractors to maintain the inside diameter of the conduit, reducing repair time from 20 to less than two minutes.

Aegion Corporation’s subsidiary, Insituform Technologies Inc., has been awarded a $5.6 million contract from the city of Crest Hill, IL. Insituform expects to install approximately 135,000 feet of small- to medium-diameter Insituform cured-in-place pipe (CIPP) in residential neighborhoods throughout Crest Hill, beginning in January 2012.

RJN Group Inc.’s (RJN) CASS WORKS software received NASSCO’s v6.0 Certification in Pipeline Assessment and Certification Program (PACP), Manhole Assessment and Certification Program (MACP) and Lateral Assessment and Certification Program (LACP).

Syndicate content