Canada reviewing six leave-to-open applications for Trans Mountain pipeline expansion project
(UI) – According to Reuters, the Canada Energy Regulator (CER) is currently reviewing six leave-to-open applications for the Trans Mountain pipeline expansion project, which aims to nearly triple crude flow from Alberta to Canada's Pacific Coast. The pipeline expansion will also “open up access to Asia and the U.S. West Coast.”
While the Trans Mountain pipeline announced oil transportation starting on May 1, it's unclear if all pending applications must be approved for operations to begin, Reuters reported.
Out of 42 applications received, CER has approved 36, covering pipeline spreads, pump stations, and tanker loading facilities. Typically, the CER has been prompt in approving these applications within a week or two of submission, Reuters predicted.
Leave-to-open applications indicate permission for sections of the pipeline to commence operations. With construction delays and cost overruns, the oil and gas industry is eager for the expansion's commencement.
This story was originally reported by Reuters.
Related News
From Archive
- DeLa Express seeks FERC approval for Permian-to-Louisiana gas pipeline project
- Hudson Tunnel Project set to generate 95,000 jobs during construction phase, report says
- Charleston Water System settles huge lawsuit over sewer system damage caused by non-flushable wipes
- Boring machine 'Chessie' resumes drilling at Chesapeake Bay Bridge-Tunnel site after anchor incident
- Aegion continues western expansion with acquisition of underground utilities company Toncco
- Ditch Witch 1030
- 24th Annual Directional Drilling Survey
- Michigan lawmakers introduce bills to create septic codes throughout the state
- House passes Rep. Duarte's legislation to streamline water permitting processes in the Valley
- Court approves 3M settlement over ‘forever chemicals’ in public drinking water systems
Comments